Design and installation of new high voltage (HV) supply for a single wind turbine connected to the UKPN network.
Objectives
CX Utilities laid 300m of high voltage triplex cable on-site from
the point of connection on the existing overhead lines to a new
substation installed by our teams.
A new Ring Main Unit (RMU) was installed to provide a grid
connection to the wind turbine allowing for 25kVA import and
900kVA export capacity.
Solutions
As this project was for renewable energy it involved a G99.
With G99’s come a few difficulties however we worked together with the DNO to overcome these issues to deliver the project on time.
The turbine is now turning high in the Norfolk countryside
and proudly powers our client’s farm and exports clean wind
energy back to the grid supporting the local network.
CX Utilities were a great partner for our Pond Farm project. In particular, they were very proactive in helping us overcome all of the project’s challenges, which is essential for a project partner. We look forward to working with the CXU team again in the future.
David Mack
Genatec